Tile Time

Substrate and prep work is now complete at all of the tile areas. The controls and layouts are set for the stone floors. Setting of the floors will start moving fast. Cabinets will be delivered next Wednesday and they will … Continue reading

Posted in Gimpel | Leave a comment

Slack Tide Complete

The exterior rot repair, re-paint and re-roof is all complete. Everything went very smoothly with no surprises. The house looks refreshed!

Posted in DiSalvo | Leave a comment

Shutters or Not?

The new paint scheme looks great, but should the shutters go back on? Overall, the house has a new lighter and cleaner feel. The new roof will start on Monday morning, then the update will be complete.

Posted in DiSalvo | Leave a comment

Exterior Facelift in Palmetto Dunes

Rot repair and paint prep are the first tasks at 1 Slack Tide. Next the entire exterior will be repainted (all new colors) followed with a new asphalt shingle roof.

Posted in DiSalvo | Leave a comment

Continuing the Pace,

The exterior is being painted and a little pool gear closet is being built under the exterior stairs. The new chimney will be ready for the color coat once the trim is in place. On the inside, the interior trim … Continue reading

Posted in Gimpel | Leave a comment

Progress Continues at Seaside Sparrow

On the inside, the drywall is now sanded and primed. Next up is the interior trim and doors, which will start on Monday. The substrates for the tub/shower are on the job and will start to be installed. The new … Continue reading

Posted in Gimpel | Leave a comment

Closing Up Walls at Seaside Sparrow

Insulation was completed yesterday and as planned drywall started today at the Gimpel’s house. The exterior siding was completed today as well. Great progress being made everyday!

Posted in Gimpel | Leave a comment

Southpaw Complete!

Your dog will not be able to pick between the beach or Southpaw!

Posted in South Paw | Leave a comment

Moving Along at Seaside Sparrow

Windows are in and rough-ins are complete. Check back tomorrow to see pictures of insulation, siding and drywall being hung. Making progress! No Fireplace!

Posted in Gimpel | Leave a comment

Getting Closer at Southpaw

Over the last few days a lot of progress was made at Southpaw to prep for the K-9 Grass. The decks were completed, fence posts set, stone delivered and final grades have been contoured. Tomorrow we pour the boundary curbing … Continue reading

Posted in South Paw | Leave a comment