Monthly Archives: February 2012

P=(m+m)M

P=(m+m)M Progress equals Man power plus Material multiplied by Proper Management. If you can put the material on the job when it’s needed and get the boots on the ground to put it up, progress with the right guidance will … Continue reading

Posted in Hilton Head Lakes | Leave a comment

A Little Structural Steel Makes a Difference

The structural steel is in at Seaside Sparrow. Two steel beams carry the loads above and the breaks in the original floor joists. Without any temporary walls the new family room is WIDE open. Moving on to pouring the topping … Continue reading

Posted in Gimpel | Leave a comment

Finally . . . some wood !

Masonry topped out, plates and LVL’s attached – open web trusses delivered; it’s about time for a floor. Stairs, anticipating the first floor Anticipating plywood decking by Tuesday and then the run up of AAC block to the 2nd floor. … Continue reading

Posted in Smith Residence | Leave a comment

Nearing Foundation Top-out

Reaching the top of a foundation is not normally a remarkable milestone in residential construction Not so in this case; if you have followed the blogpost – the demolition of the old home was the beginning of an intense couple … Continue reading

Posted in Smith Residence | Leave a comment

Temporary Walls Hold Up the House!

Temporary walls are supporting the floor/roof above and all of the original bearing walls/columns have been removed. Footings were poured today in preparation for steel columns that will be installed on Monday. The columns will support the new steel beams … Continue reading

Posted in Gimpel | Leave a comment

Lake club form work

If you blink you’ve fallen behind! Work is progressing at a very fast pace out here at the Lake Club. The first section of forms have been erected and are being squared and plumed today. At the same time the … Continue reading

Posted in Hilton Head Lakes | Leave a comment

Lake Club Time Lapse

Here is a brief time lapse movie and a recap up to date. Be sure and check back soon, things are moving fast!!  

Posted in Articles | 1 Comment

Big Changes on Seaside Sparrow in Sea Pines

We are underway at the Gimpel’s Sea Pines Home. Improvements on the lower level includes all new baths, flooring and a carport conversion to a new extra large family room. Demo has started and meetings are scheduled for the morning … Continue reading

Posted in Gimpel | Leave a comment

Your Dog Will Love This!!!

We have started the new 17,000 square foot “K-9 Grass” play yard at the Southpaw Pet Resort on Hilton Head Island. K-9 grass is a synthetic turf that is indestructible and the new yard will add to the incredible features … Continue reading

Posted in South Paw | Leave a comment

Work goes on…

The day after a milestone in a project always feels somewhat euphoric. After months and months of planning and anticipation the project starts, you mobilize, get the crews on site and put the shovels to the ground. You do layout, … Continue reading

Posted in Hilton Head Lakes | Tagged , | Leave a comment